We install EV chargers across greater Sydney — homes, strata buildings, workplaces, and fleet depots. We don't make the hardware. We choose it well, fit it properly, and stand behind it for the life of the charger.
Every job is led by a licensed A-grade electrician — never a subcontractor on day rate. The same person who quotes is on site when the work happens.
We install Zappi, Tesla, Delta, ABB, Schneider and Ocular. We recommend the right unit for your switchboard, not the one with the best margin.
10-year workmanship warranty. One Sydney number to call. If a charger fails after install, we are the only people you ring — and we come back.
See why 1,847 Sydney homes chose us. Book your site visit.
We work from Palm Beach to Cronulla, the Blue Mountains to Bondi. Same crew, same standard, same paperwork — every time.
We cover your suburb. Book a same-week site visit.
Single phase, three phase, load-balanced, solar-coupled, OCPP-ready. We carry every major charger on the Australian market and quote without bias.
Not sure which charger suits your setup? We'll recommend on the visit.
Supply and install — the charger, the labour, the certificate, all in one fixed price. No call-out fee on the first visit. Quote valid 60 days.
Single-phase 7 kW Zappi GLO installed within 5 m of the switchboard. Includes RCD, isolator, certificate of compliance.
22 kW three-phase install. Most homes north of the bridge — solar coupling supported.
Strata, workplace, fleet depot. Load-shared OCPP arrays from 4 to 200 stalls. Committee paperwork handled.
You supply the unit, we install it. Cable runs up to 10 m, single-phase. Includes Type B RCD, isolator, certificate of compliance, and our 10-year workmanship warranty. Three-phase install-only from $1,500.
A smart power sensor on your switchboard that watches your whole home's usage in real time and automatically adjusts charging speed — so the charger never trips your main breaker, even while the oven, aircon and hot water are running. Recommended for homes with smaller supply capacity, and required by some networks for 3-phase installs. Just ask for it when you book.
You'll see ads for $1,500 EV installs around Sydney. Those are usually labour-only quotes that skip the charger, the certificate, and most of what makes the install last. Our fixed price covers everything.
We design, install, and commission load-shared charger arrays for strata buildings, councils, hotels, and delivery fleets across NSW. Includes committee paperwork, OCPP back-end, billing setup.
Get your building's load-shared install scoped.
Either. We carry the major brands at trade pricing, but you're welcome to supply your own unit. The quote separates hardware from labour so you can see exactly what each costs.
Most single-phase residential installs are done in a day, often half a day. Three-phase, switchboard upgrades, and long cable runs may need a second visit, which we book in the same week.
Yes. We draft the load-balancing plan, supply the AS/NZS compliance pack, and present to your committee if needed. Most NSW strata approvals take 4–6 weeks.
Ten years on our workmanship — every join, every bracket, every conduit run. The manufacturer warranty on the charger itself varies from 3 to 7 years depending on the brand.
Greater Sydney from Palm Beach to Cronulla, west to Penrith and the lower Blue Mountains. Wollongong and the Central Coast are coming in 2026.
Still have questions? Ask us on the phone.
Tell us a bit about your property, upload a few photos, and we'll come back with a fixed quote — usually within one business day.